Header4.jpg
Kiewit
Hide Search Field
Show Search Field

Cartier Wind Energy

Cartier Wind Energy - Matane, Quebec

      A Kiewit led partnership completed its last phase of a six year contract with Cartier Wind Energy by erecting the last of a total of 354 GE 1.5MW SLE windmills, scattered throughout 4 different wind farms in the Gaspésie region, Baie-des-Sables, Anse-à-Valleau, Carleton and Gros-Morne.

      The main scope of the contract was to supply the cranes needed for the offloading and erection of windmill components. The fleet of cranes included two Manitowoc 16000 crawler cranes rigged with 295’ of main boom and a 23’ upper boom point. It also included two American 9520 truck cranes, one rigged with 140’ of main boom, the other with 150’. There were also three Grove RT hydraulic cranes used as tailing cranes to support the operations of the bigger cranes.

      Quick Links
      Featured Projects
      Haynes No. 3 and No. 4 Generating Station
      Long Beach, Cal.
      TD Ameritrade Headquarters
      Omaha, Neb.
      Contact Kiewit

      Home Office : 3555 Farnam St. Omaha, NE

      Home Office : (402) 342-2052

      General Info : info@kiewit.com

      Locations Page   |   Career Search

      ThinkSafety-color.png  Quality-color.png

      Environmental-color.png  Compliance-color.png

      Contact Kiewit

      Kiewit Australia
      2 Kings Park Road
      West Perth, AU-WA 6005
      Phone: +61 8 6230 6200

      © 2021 Kiewit Corporation. All Rights Reserved.